2.1 kW Grid Tie Solar Power System in Mahone Bay installed on an outbuilding

Notice available rail space available above for future expansion.

Junction box and conduit connection. Green wire is for system ground.

Elita installing a rail for the solar module mounting system

Placing a solar module on the rails and centering to ensure a symmetrical installation
Installed Systems

Off Grid Solar Power

Grid Tied Solar Power

Wind Turbines

